1. Standard and edition
Confirm the full standard reference and edition required by the destination market or tender. Do not treat all EN ISO 20345 reports as interchangeable.

Certification buyer guide
Short answer
Choose S4 when waterproof safety boots need toe protection and the core properties for all-polymeric footwear, but the workplace does not require penetration resistance or a cleated outsole. Choose S5 when underfoot puncture risk and cleated outsole performance are part of the specification.
A category name alone is not enough. Buyers should verify the exact standard edition, model identification, tested construction, report scope, product marking and whether the approved sample matches the certificate holder's tested product.
Decision framework
| Buyer question | S4 | S5 |
|---|---|---|
| Basic protection | Toe protection, closed heel, antistatic properties and energy absorption | Same S4 base requirements |
| Water resistance | Inherently water resistant construction | Inherently water resistant construction |
| Penetration resistance | Not required by the S4 category | Required; confirm insert type and test evidence |
| Cleated outsole | Not required by the S4 category | Required for the S5 category |
| Typical selection | Wet indoor work where underfoot puncture risk is controlled | Construction, agriculture and rough sites with underfoot hazards |
Buyer checklist
Confirm the full standard reference and edition required by the destination market or tender. Do not treat all EN ISO 20345 reports as interchangeable.
Match the model code, footwear type, protection category, construction and tested variants to the offered product.
Check the laboratory or certification body, report number, dates, pages and any searchable verification channel.
Compare the physical boot and label markings with the model identity, size range, standard and protection category in the technical file.
Record the toe cap, penetration insert, outsole, upper compound and assembly that support the claimed result.
Define batch records, approved suppliers and change-control rules so bulk production does not drift from the tested construction.
Buyer checklist
Start with water, impact, puncture, slip, cold, chemicals and outsole conditions. Select the category only after the risk is clear.
Write the material, construction, components, size range, marking, packaging and destination-market requirements into the sample brief.
Cross-check the test report and certificate against the actual sample. Escalate unclear variants before approving color or tooling.
Use incoming, in-line and final checks for critical components, dimensions, markings and workmanship. Record deviations and release decisions.
Reliable Safety Products
Use the certification hub for the full category overview, then review relevant products and the controls used to keep production aligned with the approved sample.
FAQ
S5 includes the S4 base requirements and adds penetration resistance plus a cleated outsole. Buyers should still confirm the exact standard edition and report scope.
Not automatically. A construction, material, component or factory change may fall outside the tested configuration. Confirm permitted variants with the certification body or testing laboratory before production.
The commercial supplier and certificate holder can differ, but the relationship and production authorization should be explainable. Verify the tested model, manufacturing site and traceability instead of relying only on a company name.
Marking normally needs manufacturer or identification information, model or type reference, size, applicable standard and protection category. Check current market rules and approved technical documentation.
Yes. Compound, toe cap, penetration insert, outsole dimensions or process settings can change. Lock the approved sample and critical bill-of-material details, then inspect production consistency.
Send the target market, work environment, required protection class and product concept. Reliable Safety Products can help align the specification, sample and certification path before bulk production.
Discuss certification requirements